![Oxford Instruments OpAL System Manual Download Page 172](http://html.mh-extra.com/html/oxford-instruments/opal/opal_system-manual_1664943172.webp)
OpAL
Oxford Instruments Plasma Technology
System Manual
WARNING
BEFORE PROCEEDING WITH ANY MAINTENANCE WORK, READ SECTION 1 - HEALTH AND SAFETY.
6.1
Periodic maintenance schedule
Periodic maintenance requerments are listed in Table 6-1. However, this list is not
exhaustive and must be read in conjunction with the remainder of this Section.
Item Description
Action
Frequency
1
Vacuum switch
Check the interlock.
Weekly.
2
Interlock chain
Check the function of all interlocks.
Monthly
3
Chamber seals
Wipe using lint cloth and IPA
Monthly – change seals
annually.
4
CM gauge zero
drift
Reset 0
Quarterly
5
Chamber liners
Remove upper and lower liners and bead
blast. If available, ultra sonic clean.
Every 5-microns
deposition on wafer
6 Chamber
gas
springs
Exchange for new ones.
Annually
7
Precursor line
Leak check.
Monthly
8 ALD
valves
Clean.
Annually
9
Pump oil
Check level
Renew
TMA – weekly
Other chemistries –
monthly
Anually or sooner
depending on process.
10
Oil cartridge filter
Check
Renew
TMA – weekly
Other chemistries –
monthly
Anually or sooner
depending on process.
11
ICP 65 ceramic
tube
Remove and bead blast, wipe with IPA
Annually
12
Showerhead
Remove and bead blast
Every 5-microns
deposition on wafer
13
Electrode
Remove and bead blast
Annually
14
ICP gate valve
Remove actuator and clean
Annually
Table 6-1: Periodic maintenance schedule
Maintenance
Issue 4: July 10
Page 6-2 of 16
Printed: 14-Jul-10, 8:14
Summary of Contents for OpAL
Page 14: ......