![Oxford Instruments OpAL System Manual Download Page 10](http://html.mh-extra.com/html/oxford-instruments/opal/opal_system-manual_1664943010.webp)
``
Environmental Agency Producers Registration Number for WEEE: WEE/AE0116XU
Page 10 of 13
QCF89 issue 8
09/11/07
between inlet and outlet must be 3 - 4 Bar (45 – 60PSI). Water supply
should be connected to each inlet/outlet on the system in parallel and not
series. Note Inlet and Outlet Pressure.
Pressure
Pressure
10. Has N2 vent been connected to the system? Inlet must be able to
maintain a pressure of 3 Bar (45psig). Note Pressure.
Vent Nitrogen Inlet Pressure
11. Has N2 purge been connected to the system? Inlet must be able to
maintain a pressure of 3 Bar (45psig). Note Pressure.
Purge Nitrogen Inlet Pressure
12. If the system is configured with cryogenic cooling, is an LN2 Dewar,
filled with LN2 available? Is the Dewar connected to the system via 3/8”
Swagelock connections and is the pipe work adequately insulated to prevent
a safety hazard?
Is the pipe work adequately
insulated to prevent a safety
hazard?
13. Have all of the gas pod connections been made to the appropriate gas
supply or system connection. Have they been leak checked?
14. All process gasses should be available for the system
commissioning. Please verify that each gas, as it is laid out
Name
of Gas
Inlet
Pressure
Heated? Leak
Rate
Name
of Gas
Inlet
Pressure
Heated? Leak
Rate
Summary of Contents for OpAL