12.
Pinch the hinge pins together into the stored position. Align the hinge halves
together between the two units, and swing together side by side. The hinge pins
should snap into place, securing the front of the two units.
13.
In the back of the unit, take the supplied Hex Spacer (item no. 7), and place between
middle rear brackets, and secure using the supplied 8-mm screws (item no. 6).
14.
Assembly is now ready for installation into standard 19" rack.
15.
Depending on accessibility, you can complete the electrical installation before or
after installing the assembly in the rack. For electrical installation, see
Rack-Mount Installation with an Agilent Power Meter
GSG units are frequently installed adjacent to an
Agilent Power Meter
, using one 19" slot
(2U). This can be accomplished with the optional Orolia
22/04 rack-mount kit
(P/N
9446-1002-2041
). Also required is the Agilent rack-mount kit.
Note:
This kit can also be used to install only one GSG unit in a 19" rack 2U
slot, similar to the optional Orolia
22/90 Rack-Mount Kit
(P/N 9446-1002-
2901).
Figure 2-7:
22/04 Rack-mount kit
In order to prepare the GSG unit for rack mount installation, the housing needs to be
opened, in order to remove the bottom feet (otherwise the assembly will not fit in a 2U
slot.) The same may be necessary for the Agilent unit – follow the manufacturer's instruc-
tions.
1.
After making sure that the power cord has been unplugged, carefully turn the GSG
unit upside down.
2.
Temporarily remove the two
rear feet
by loosening their screws.
3.
Remove the four
housing screws
and plugs (if present) at the side panels, and dis-
card them.
20
User Manual GSG-5/6 Series Rev. 27
2.3 Mechanical Installation
Summary of Contents for GSG-5 Series
Page 2: ......
Page 4: ...Blank page II User Manual GSG 5 6 Series...
Page 42: ...BLANK PAGE 2 5 Signal Power Level Considerations 26 User Manual GSG 5 6 Series Rev 27...
Page 382: ...BLANK PAGE 6 7 Revision History SCPI Guide 366 User Manual GSG 5 6 Series Rev 27...