
Figure 2-2:
Rack-Mount-Kit (the GSG housing shown in the center is not part of the kit)
In order to prepare the GSG unit for rack-mount installation, the housing needs to be
opened, in order to remove the bottom feet (otherwise the assembly will not fit in a 2U
slot.)
DANGER!
Do not perform any work on the internal components of the unit,
while the housing is removed, unless you are qualified to do so. Before
removing the cover, unplug the power cord and wait for one minute to
allow any capacitors to discharge.
1.
After making sure that the power cord has been unplugged, carefully turn the unit
upside down.
2.
Temporarily remove the two
rear feet
by loosening their screws.
3.
Remove the four
housing screws
and plugs (if present) at the side panels; discard
them.
4.
Grip the front panel with one hand, while pushing at the rear with the other hand.
Pull the unit out of its housing.
5.
Remove the four
bottom feet
from the housing, as shown in the illustration below:
Use a screwdriver or a pair of pliers to remove the springs holding each foot, then
16
User Manual GSG-5/6 Series Rev. 27
2.3 Mechanical Installation
Summary of Contents for GSG-5 Series
Page 2: ......
Page 4: ...Blank page II User Manual GSG 5 6 Series...
Page 42: ...BLANK PAGE 2 5 Signal Power Level Considerations 26 User Manual GSG 5 6 Series Rev 27...
Page 382: ...BLANK PAGE 6 7 Revision History SCPI Guide 366 User Manual GSG 5 6 Series Rev 27...