10.
Install the assembly in your rack, using the M6 screws that came with the
rack-
mount kit
.
11.
Complete the electrical installation.
Side-by-Side Rack-Mount Installation
With the optional Orolia
22/05 rack-mount kit
(P/N
1211-0000-0701
), two GSG units can
be installed side-by-side in one 19-inch rack (2U). The kit comprises:
4 x Bracket, rear (1211-1000-0706) [Item
1
]
2 x Ear, rack (1211-1000-0714) [Item
2
]
1 x Hinge, right half (1211-1000-0709) [Item
3
]
1 x Hinge, left half (1211-1000-0709) [Item
4
]
8 x Screw, oval head phil, M5x10mm (HM25R-D5R8-0010) [Item
5
]
2 x Screw, pan head phil, M4x8mm (HM10R-04R0-0008) [Item
6
]
1 x Spacer, Hex, M4x16 (HM50R-04R0-0016) [Item
7
]
Figure 2-5:
Dual rack-mount assembly
In order to prepare the GSG units for rack mount installation, the housings needs to be
opened, in order to remove the bottom feet (otherwise the assembly will not fit in a 2U
slot.)
18
User Manual GSG-5/6 Series Rev. 27
2.3 Mechanical Installation
Summary of Contents for GSG-5 Series
Page 2: ......
Page 4: ...Blank page II User Manual GSG 5 6 Series...
Page 42: ...BLANK PAGE 2 5 Signal Power Level Considerations 26 User Manual GSG 5 6 Series Rev 27...
Page 382: ...BLANK PAGE 6 7 Revision History SCPI Guide 366 User Manual GSG 5 6 Series Rev 27...