Base Radio Startup Sequence
Chapter 6: Con
fi
guration and Testing
Base Radio Startup Sequence
The following procedure describes starting the base radio controller (BRC) and using
test software resident in the BRC
fl
ash memory.
Procedure 6-2
Base Radio LED Verification
1
Verify the following LED conditions on the base radio controller according to
Table 6-5
Base Radio LEDs: Normal Startup Sequence
Status
Tx
(Transmit)
Alarm
Description
off
off
off
No power / initial
LED test (
fl
ashing multicolor)
off
off
Red
Booting
Amber
off
Red
Waiting for SWDL – this is where the BR will wait if no Site
Controller is present.
Green
off
Red
BRC main application is running
Green
off
off
No active alarms
Green
Green
off
BR is keyed
Table 6-6
Base Radio LEDs: Hardware Failure
Status
Tx
(Transmit)
Alarm
Description
off
off
off
No power / initial
LED test (
fl
ashing multicolor)
off
off
Red
Booting
Amber
off
Red
Waiting for SWDL – this is where the BR will wait if no Site
Controller is present.
Green
off
Red
BRC main application is running but an alarm is preventing the BRC
from keying
Refer to the Controls and Indicators section in the
for
conditions relating to the LEDs listed above.
6-14
6802800U74-N September 2009
Summary of Contents for DIMETRA MTS 2
Page 4: ...This page intentionally left blank ...
Page 28: ...List of Procedures This page intentionally left blank xxii 6802800U74 N September 2009 ...
Page 30: ...List of Processes This page intentionally left blank xxiv 6802800U74 N September 2009 ...
Page 486: ...This page intentionally left blank A 10 6802800U74 N September 2009 ...
Page 492: ...This page intentionally left blank B 6 6802800U74 N September 2009 ...
Page 496: ...This page intentionally left blank C 4 6802800U74 N September 2009 ...