
4-42 Manual # 42-02-2223
Final Adjustment
Safety Tests
iControl provides highly automated safety testing. Before running any tests, the car must be
properly balanced and adjusted. From the iView Safety Tests screen (View > Safety Tests), the
following tests may be run:
• Car/Counterweight Safety Test,
page 4-44
• Electrical Governor Test,
page 4-44
• Contract Overspeed Test,
page 4-45
• Inspection Overspeed Test,
page 4-45
• Car/Counterweight Buffer Test,
page 4-45
• Leveling Overspeed Test,
page 4-47
• Emergency Brake Test, Unintended Motion,
page 4-47
• Ascending Car Overspeed Test,
page 4-50
• Normal Terminal Switch Overspeed Tests - Level 1,
page 4-52
• Emergency Terminal Switch Overspeed Tests,
page 4-53
• Normal Terminal Switch Position Tests,
page 4-53
• Emergency Terminal Switch Overspeed Test,
page 4-54
Summary of Contents for Nidec iControl
Page 1: ...MOTION CONTROL ENGINEERING User Guide iControl with AC Drive...
Page 15: ......
Page 23: ...1 8 Manual 42 02 2223 iControl Overview...
Page 75: ...2 52 Manual 42 02 2223 Construction Mode...
Page 89: ...3 14 Manual 42 02 2223 Inspection Mode...