Figure 97. Copper water loop protective bracket removal
Step 11. Press firmly on the 16 microprocessor screws and tighten them with a screwdriver, alternating
among the screws until they are tight. If possible, each screw should be rotated two full rotations at
a time. Repeat until the screws are tight. Do not overtighten the screws by using excessive force. If
you are using a torque wrench, tighten the screws to 1.0 to 1.2 Newton-meters (Nm) (8.85 to 10.6
inch-pounds).
Figure 98. Tighten cold plate captive screws
Step 12. Install the front and rear clamp plates. (12 screws).
178
Lenovo NeXtScale nx360 M5 water-cooled technology tray Lenovo NeXtScale n1200 Enclosure Installation and Service Guide
Summary of Contents for NeXtScale n1200
Page 115: ...Chapter 6 Removing and replacing server components 101 ...
Page 117: ...Chapter 6 Removing and replacing server components 103 ...
Page 119: ...Chapter 6 Removing and replacing server components 105 ...
Page 135: ...Chapter 6 Removing and replacing server components 121 ...
Page 137: ...Chapter 6 Removing and replacing server components 123 ...
Page 139: ...Chapter 6 Removing and replacing server components 125 ...
Page 869: ...Taiwan Class A compliance statement Appendix E Notices 855 ...
Page 877: ......
Page 878: ...Part Number SP47A31725 Printed in China 1P P N SP47A31725 1PSP47A31725 ...