8
-2
PAT-T 4kW
8.1
Inspection
Periodic inspection is essential to maintain the initial performance of the PAT over
an extended period.
Check for tears in the power cable insulation and breaks in the terminal block.
•
Tears in the insulation coating may cause electric shock or fire. If a
tear is found, stop using it immediately.
To purchase accessories or options, contact your Kikusui agent or distributor.
8.2
Cleaning the Dust Filter
Two dust filter sheets are installed on the inside of the louver on the front panel.
Periodically clean the filter to prevent clogging.
•
Clogged filters hinder the cooling of the inside of the PAT and can ca
u
se a
malf
u
nction and shortening of the service life.
•
When the PAT is in operation, air is s
u
cked thro
u
gh the d
u
st filter to cool
the inside.
If moist
u
re is present in the d
u
st filter, the temperat
u
re or h
u
midity inside
the PAT increases and may ca
u
se a malf
u
nction.
Removing the dust filter
1
Remove the lo
w
er lo
u
ver from the panel.
While lifting the bottom of the removal mark with your finger tips, slide the entire
louver to the right. Then, pull it toward you.
Fig.
8
-1
Lo
u
ver removal
WARNING
CAUTION
W
hile lifting the
b
ottom of the remo
v
al
mark with your finger tips (
),
slide the entire lou
v
er to the right (
).
Remo
v
al mark
Upper lou
v
er
Lower lou
v
er
1
2
1
2
2
Summary of Contents for PAT160-25T
Page 17: ...General Description This chapter describes an overview and describes the features...
Page 22: ...1 6 PAT T 4kW...
Page 34: ...2 12 PAT T 4kW...
Page 106: ...6 12 PAT T 4kW...
Page 158: ...7 52 PAT T 4KW...
Page 159: ...Maintenance This chapter describes maintenance such as cleaning inspecting and calibrating...
Page 171: ...Specifications This chapter describes the specifications and gives the dimensions of the PAT...