PAT-T 4kW
6-11
6
P
a
rall
el/S
erie
s Opera
ti
o
n
Setting the overvoltage protection (OVP) and overcurrent
protection (OCP)
Overvoltage protection (OVP) and overcurrent protection (OCP) must be configured
on each unit when carrying out series operation. Set the same values on each unit.
6.2.4
Starting the Series Operation
Turning the power on/off
Turn on/off the POWER switches on unit 1 and unit 2.
•
When t
u
rning the POWER s
w
itch off and then back on, allo
w
at least 10
seconds after the fan stops. Repeated on/off of the POWER s
w
itch at
short intervals can ca
u
se damage to the inr
u
sh c
u
rrent limiter and
shorten the service life of the POWER s
w
itch and internal inp
u
t f
u
se.
Turning the output on/off
Turn on/off the OUTPUT switches on unit 1 and unit 2.
See
CAUTION
Summary of Contents for PAT160-25T
Page 17: ...General Description This chapter describes an overview and describes the features...
Page 22: ...1 6 PAT T 4kW...
Page 34: ...2 12 PAT T 4kW...
Page 106: ...6 12 PAT T 4kW...
Page 158: ...7 52 PAT T 4KW...
Page 159: ...Maintenance This chapter describes maintenance such as cleaning inspecting and calibrating...
Page 171: ...Specifications This chapter describes the specifications and gives the dimensions of the PAT...