![Kärcher SB MU Manual Download Page 59](http://html1.mh-extra.com/html/karcher/sb-mu/sb-mu_manual_655662059.webp)
-
21
The prerinse of the RO membrane will be
completed in X seconds.
The reverse osmosis produces permeate.
The final rinse of the RO membrane will be
completed in XX seconds.
Permeate production blocked as the base
exchanger is performing a regeneration.
No water pressure at inlet of the system.
Buffer container for permeate filled with
permeate to the level sensor BUFFER
CONTAINER FULL.
Water level in the buffer container for per-
meate is below level sensor BUFFER
CONTAINER FULL.
Water level in the buffer container for per-
meate is below level sensor BUFFER
CONTAINER EMPTY.
Dry run delay active after XXX minutes.
During this period, the SB-C is supplied
with cold water.
The buffer container for permeate is empty,
the SB-C is supplied with cold water.
Here, the operaing hours of the individual
system components since system start-up
are shown.
The different menu items are shown in the
overview at the beginning of this chapter.
The bases of a safe operating of the equip-
ment is thr regularly maintenance accord-
ing to the following maintenance plan.
Use only original parts of the manufacturer
or part suggessted by him, such as
–
parts and wearing parts,
–
accessories parts,
–
operating materials,
–
cleaning agents.
Danger
Risk of accident while working on the unit.
During all tasks
Turn off the water supply; close the
fresh water tap,
First switch-on in voltage-less state,
switch off the emergency stop switch in
the building and secure it against being
switched on again.
몇
Warning
Risk of damage. Never use a high-pressure
jet to clean the inside of the system.
–
Operator
Work designated with the sign “Opera-
tor” may only be carried out by persons
who have been instructed in the safe
operation and maintenance on the
washing system.
–
Customer Service
Work designated with the sign “Cus-
tomer Service” may only be done by the
fitters of Kärcher Customer Service.
In order to ensure a reliable operation of the
plant, we recommend that you conclude a
maintenance contract with us. Please refer
to you local KÄRCHER service depart-
ment.
Danger!
danger of injury because of possible dam-
aged parts of the high pressure jet, danger
of burns because of hot equipment parts..
When working, while the equipment is open
take special care, and obey all safty notic-
es!.
The following parts are possible to be hot-
ter than 50 °C:
–
cylinder head of the high pressure
pump
–
high pressure hose
Operating hours
Maintenance instructions
Who may perform maintenance?
Maintenance contract
59
EN
Summary of Contents for SB MU
Page 2: ...2 ...
Page 9: ... 7 1 Menuepunkt 2 Parameter 9 DE ...
Page 15: ... 13 Funktion Fließschema 2 Werkzeug Ausführung 15 DE ...
Page 16: ... 14 Fließschema 1 Werkzeug Ausführung 16 DE ...
Page 21: ... 19 21 DE ...
Page 45: ... 7 1 Menu item 2 Parameter 45 EN ...
Page 51: ... 13 Function Flow chart 2 tool design 51 EN ...
Page 52: ... 14 Flow chart 1 tool design 52 EN ...
Page 57: ... 19 57 EN ...
Page 82: ... 7 1 Rubrique de menu 2 Paramètre 82 FR ...
Page 88: ... 13 Fonction Schéma de flux exécution à 2 outils 88 FR ...
Page 89: ... 14 Schéma de flux exécution à 1 outils 89 FR ...
Page 94: ... 19 94 FR ...
Page 119: ... 7 1 Punto del menú 2 Parámetros 119 ES ...
Page 125: ... 13 Función Esquema de flujo modelo con 2 herramientas 125 ES ...
Page 126: ... 14 Esquema de flujo modelo con 1 herramienta 126 ES ...
Page 131: ... 19 131 ES ...
Page 159: ... 7 1 Menypunkt 2 Parameter 159 SV ...
Page 160: ... 8 1 Menypunkt 2 Parameter 160 SV ...
Page 167: ... 15 Funktion Flödesschema 2 verktygs utförande 167 SV ...
Page 168: ... 16 Flödesschema 1 verktygs utförande 168 SV ...
Page 173: ... 21 173 SV ...
Page 174: ... 22 174 SV ...
Page 194: ......
Page 195: ......