A second person feeds more conveyor belt onto the infeed
rails by pulling and pushing the conveyor belt into the
equipment at the infeed unit.
7. When it is not possible to manually add more conveyor belt
onto the drive system it is time to start pulling the conveyor
belt with the drive chains. Do as follows:
•
One person, standing beside the belt, pushes the conveyor
belt onto the drive chains and at the same time ensures that
the leading end of the conveyor belt is onto the z-clip of the
inner chain.
•
A second person, standing at the infeed unit, feeds more
conveyor belt into the equipment when the drive system
starts.
•
A third person, operating the safety handle, starts and stops
the drive system when needed.
8. Splice more conveyor belt to the installed conveyor belt as
the installation proceeds to the next step.
Warning
The drive system must always be operated with
the safety handle during conveyor belt
installation. The person operating the safety
handle must always be alert and make sure
installation personal is ready and prepared for
the drive system to start. The operator must be
located at a place where it is possible to view
all installation personal at the same time. Even
more important is that the operator of the safety
handle stops the drive system at any sign or
indication of danger. If these instructions are not
followed, it can cause serious body injury and in
extreme cases, death.
9. Observe the conveyor belt running through the mezzanine
floors. To avoid the risk of conveyor belt jam and destacking,
fold the hytrel seal away from the conveyor belt by using
tape.
10. Observe the conveyor belt as it enters the support ring. The
conveyor belt must enter the support ring from the side,
never from the bottom.
Refer to illustrations 1 and 2.
11. Install the conveyor belt up to the cheese cutter.
1. Wrong adjustment
2. Correct adjustment
Summary of Contents for FoodTech Frigoscandia GYRoCOMPACT M7
Page 1: ...0 INSTALLATION MANUAL Frigoscandia GYRoCOMPACT M7 Spiral Freezer...
Page 2: ...N...
Page 4: ...INSTALLATION 2 2 INTRODUCTION 02 INSTALLATION MANUAL...
Page 6: ...2 2 0000 07 01 01 00 INSTALLATION MANUAL INSTALLATION...
Page 8: ...2 2 0000 07 01 02 00 INSTALLATION MANUAL INSTALLATION...
Page 16: ...10 0000 00 01GB 11 24 SAFETY...
Page 20: ...SAFETY 4 1000 07 01GB 02 03...
Page 34: ...6 INSTALLATION PREPARATIONS 1000 07 01GB 05 03...
Page 42: ...8 DELIVERY INFORMATION 0000 03 01GB 11 09...
Page 44: ...2 INSTALLATION 1000 07 01GB 07 01 INSTALLATION MANUAL...
Page 48: ...2 INSTALLATION 1000 07 01GB 09 03 INSTALLATION MANUAL...
Page 54: ...2 INSTALLATION 1000 07 01GB 12 00 INSTALLATION MANUAL...
Page 58: ...4 INSTALLATION 1000 07 01GB 13 01 INSTALLATION MANUAL...
Page 62: ...2 INSTALLATION 1000 07 01GB 15 00 INSTALLATION MANUAL...
Page 70: ...2 INSTALLATION INSTALLATION MANUAL 1000 07 01GB 18 01...
Page 72: ...2 INSTALLATION 1000 07 01GB 20 00 INSTALLATION MANUAL...
Page 78: ...6 INSTALLATION 1000 07 01GB 22 03 INSTALLATION MANUAL...
Page 90: ...4 INSTALLATION 1000 07 01GB 29 00 INSTALLATION MANUAL...
Page 110: ...6 INSTALLATION 1000 07 01GB 25 01 INSTALLATION MANUAL...
Page 128: ...18 INSTALLATION 1000 07 01GB 26 06...
Page 144: ...2 INSTALLATION 1000 07 01GB 19 00 INSTALLATION MANUAL...
Page 152: ...2 INSTALLATION 1000 07 01GB 36 00 INSTALLATION MANUAL...
Page 194: ...10 221 01GB 03 SERVICE INFO...
Page 200: ...10 171 01GB 02 SERVICE INFO...
Page 222: ...172 347 01GB 00 SERVICE INFO...
Page 230: ...10 039 01GB 03 SERVICE INFORMATION...
Page 256: ...172 CORRECTIVEMAINTENANCE 1000 06 01GB 10 11...
Page 269: ...Automatic Pump Station PZC M1 PZE M2 CIP M3 Directions for use 3 19 EN...
Page 277: ...9 ALTO Danmark A S...