3
1000-07-01GB-10-00
INSTALLATION
INSTALLATION MANUAL
21. Do a second, finer, check of the ballrails.
Use you thumb to feel all the joints of the
rails. If there are any joints that can stop the
balls, grind them gently with a grindstone
and check the joint again, using a ball.
22. Install the wear strips. Lock the screws with
LocTite 243.
23. Fine-polish the rails with the polish wheel.
Make sure that there are no sharp edges on
the small M6 holes.
Notes on the steelworks
Note!
Make sure that the ballrails are correctly ad-
justed, before you adjust the infeed rails. Refer
to the drawing “check list” for the actual freezer
and to service info 12-05-162.
Note!
Do a check of the outer ball chain tensioner’s
freedom of movement, if you have adjusted the
ballrails at the outer transfer point.
Fan driven by-pass air balance
tunnel
Function
The air balance tunnel creates air curtains that
prevents air from blowing out or in through the
openings. The air curtains also prevents the
products from moving while they are inside the
tunnel.
The air flow in the tunnel is created by a fan
which is controlled by a frequency converter.
The speed of the rotation of the motor can be
adjusted from the control panel.
Adjustments
Make sure that the fan wheel rotates in the
correct direction.
Refer to illustration 5.
Check if there is an air flow through the infeed
or outfeed by attaching plastic strips over the
outfeed.
Refer to illustration 6.
Adjust the fan until there is no air flow through
the opening.
3. The air balance tunnel.
Air flow in stack,
downwards
Air flow in stack,
upwards
4. The air flow in the tunnel.
5. The direction of the rotation of the fan wheel.
6. The plastic strips attached over the
infeed or outfeed.
Summary of Contents for FoodTech Frigoscandia GYRoCOMPACT M7
Page 1: ...0 INSTALLATION MANUAL Frigoscandia GYRoCOMPACT M7 Spiral Freezer...
Page 2: ...N...
Page 4: ...INSTALLATION 2 2 INTRODUCTION 02 INSTALLATION MANUAL...
Page 6: ...2 2 0000 07 01 01 00 INSTALLATION MANUAL INSTALLATION...
Page 8: ...2 2 0000 07 01 02 00 INSTALLATION MANUAL INSTALLATION...
Page 16: ...10 0000 00 01GB 11 24 SAFETY...
Page 20: ...SAFETY 4 1000 07 01GB 02 03...
Page 34: ...6 INSTALLATION PREPARATIONS 1000 07 01GB 05 03...
Page 42: ...8 DELIVERY INFORMATION 0000 03 01GB 11 09...
Page 44: ...2 INSTALLATION 1000 07 01GB 07 01 INSTALLATION MANUAL...
Page 48: ...2 INSTALLATION 1000 07 01GB 09 03 INSTALLATION MANUAL...
Page 54: ...2 INSTALLATION 1000 07 01GB 12 00 INSTALLATION MANUAL...
Page 58: ...4 INSTALLATION 1000 07 01GB 13 01 INSTALLATION MANUAL...
Page 62: ...2 INSTALLATION 1000 07 01GB 15 00 INSTALLATION MANUAL...
Page 70: ...2 INSTALLATION INSTALLATION MANUAL 1000 07 01GB 18 01...
Page 72: ...2 INSTALLATION 1000 07 01GB 20 00 INSTALLATION MANUAL...
Page 78: ...6 INSTALLATION 1000 07 01GB 22 03 INSTALLATION MANUAL...
Page 90: ...4 INSTALLATION 1000 07 01GB 29 00 INSTALLATION MANUAL...
Page 110: ...6 INSTALLATION 1000 07 01GB 25 01 INSTALLATION MANUAL...
Page 128: ...18 INSTALLATION 1000 07 01GB 26 06...
Page 144: ...2 INSTALLATION 1000 07 01GB 19 00 INSTALLATION MANUAL...
Page 152: ...2 INSTALLATION 1000 07 01GB 36 00 INSTALLATION MANUAL...
Page 194: ...10 221 01GB 03 SERVICE INFO...
Page 200: ...10 171 01GB 02 SERVICE INFO...
Page 222: ...172 347 01GB 00 SERVICE INFO...
Page 230: ...10 039 01GB 03 SERVICE INFORMATION...
Page 256: ...172 CORRECTIVEMAINTENANCE 1000 06 01GB 10 11...
Page 269: ...Automatic Pump Station PZC M1 PZE M2 CIP M3 Directions for use 3 19 EN...
Page 277: ...9 ALTO Danmark A S...