3
1000-07-01GB-03-02
INSTALLATION PREPARATIONS
CUSTOMERS EQUIPMENT AND
PREPARATIONS
This document lists and describes the needed equipment and
preparations for the installation of the equipment that is de-
scribed in this manual. Use the appended checklist to make
sure that all the preparing steps are carried out.
Refer to the
installation manual: Customers equipment and preparations
checklist, 1000-07-01-92-##.
Required preparations
All required preparations must be finished at the site before the
site supervisor arrives. The aim with this is to ensure a proper
installation within the estimated time schedule.
Refer to the
installation matrix
Pre-installation
1. Make sure that there is enough space in the storage area.
2. Make sure that the entrance gate to the storage area is big
enough.
3. Make sure that the sub floor will be correctly prepared ac-
cording to the drawings and completed before the installa-
tion is scheduled to start. If it is complete, check its levels
and dimentions and the functionality of the heating cables.
4. Make sure that the space and gates at the customer’s facili-
ties are big enough.
5. Discuss the dimension and connection drawings with the
customer: the positioning of the doors, cleaning system,
openings and refrigeration connections etc.
6. Discuss safety matters with the customer and have them
sign the JBT FoodTech safety protocol.
Required equipment
All required equipment must be avaliable at the site before the
site supervisor arrives. The aim with this document is to ensure
a proper installation within the estimated time schedule,
refer to
the installation manual: the installation matrix.
For further details
about the unloading of the equipment,
refer to the installation
manual: Unloading the equipment, 1000-07-01-05-##.
Summary of Contents for FoodTech Frigoscandia GYRoCOMPACT M7
Page 1: ...0 INSTALLATION MANUAL Frigoscandia GYRoCOMPACT M7 Spiral Freezer...
Page 2: ...N...
Page 4: ...INSTALLATION 2 2 INTRODUCTION 02 INSTALLATION MANUAL...
Page 6: ...2 2 0000 07 01 01 00 INSTALLATION MANUAL INSTALLATION...
Page 8: ...2 2 0000 07 01 02 00 INSTALLATION MANUAL INSTALLATION...
Page 16: ...10 0000 00 01GB 11 24 SAFETY...
Page 20: ...SAFETY 4 1000 07 01GB 02 03...
Page 34: ...6 INSTALLATION PREPARATIONS 1000 07 01GB 05 03...
Page 42: ...8 DELIVERY INFORMATION 0000 03 01GB 11 09...
Page 44: ...2 INSTALLATION 1000 07 01GB 07 01 INSTALLATION MANUAL...
Page 48: ...2 INSTALLATION 1000 07 01GB 09 03 INSTALLATION MANUAL...
Page 54: ...2 INSTALLATION 1000 07 01GB 12 00 INSTALLATION MANUAL...
Page 58: ...4 INSTALLATION 1000 07 01GB 13 01 INSTALLATION MANUAL...
Page 62: ...2 INSTALLATION 1000 07 01GB 15 00 INSTALLATION MANUAL...
Page 70: ...2 INSTALLATION INSTALLATION MANUAL 1000 07 01GB 18 01...
Page 72: ...2 INSTALLATION 1000 07 01GB 20 00 INSTALLATION MANUAL...
Page 78: ...6 INSTALLATION 1000 07 01GB 22 03 INSTALLATION MANUAL...
Page 90: ...4 INSTALLATION 1000 07 01GB 29 00 INSTALLATION MANUAL...
Page 110: ...6 INSTALLATION 1000 07 01GB 25 01 INSTALLATION MANUAL...
Page 128: ...18 INSTALLATION 1000 07 01GB 26 06...
Page 144: ...2 INSTALLATION 1000 07 01GB 19 00 INSTALLATION MANUAL...
Page 152: ...2 INSTALLATION 1000 07 01GB 36 00 INSTALLATION MANUAL...
Page 194: ...10 221 01GB 03 SERVICE INFO...
Page 200: ...10 171 01GB 02 SERVICE INFO...
Page 222: ...172 347 01GB 00 SERVICE INFO...
Page 230: ...10 039 01GB 03 SERVICE INFORMATION...
Page 256: ...172 CORRECTIVEMAINTENANCE 1000 06 01GB 10 11...
Page 269: ...Automatic Pump Station PZC M1 PZE M2 CIP M3 Directions for use 3 19 EN...
Page 277: ...9 ALTO Danmark A S...