4
1000-07-01GB-50-00
INSTALLATION
Balloon
Description
A
Stack Tension
Maximum conveyor belt tension at the first conveyor belt
stack tier. Normally where the inner side of the conveyor belt
collapses.
B
Outfeed Tension
Maximum conveyor belt tension at the last conveyor belt
stack tier, before outfeed. Normally where the inner side of
the conveyor belt expands.
The conveyor belt tension should be adjusted to maintain within
recomennded tolerances:
Single Stack
Equipment
A
B
Outfeed
GC 42/400
300–400N 200–350N
Passive
GC 60
500–600N 200–350N
GC 60/600
500–600N 300–400N
Active
GC M7/76
500–600N 300–400N
GC M8
500–600N 300–400N
GC M9/92
600–800N 300–400N
GC M10/106
600–800N 300–400N
Singel Stack – Conveyor Belt Tension Adjustment
If required there are some ways to increase or decrease the
conveyor belt tension.
Adjusting Stack Tension (A):
•
To increase the conveyor belt tension, replace the return rail
rollers with glide strips.
•
To decrease the conveyor belt tension, replace the return
rail glide strips with rollers.
Adjusting Outfeed Tension (B):
•
To increase the conveyor belt tension, increase the force
provided by the outfeed drive unit
1)
.
•
To decrease the conveyor belt tension, decrease the force
provided by the outfeed drive unit
1)
.
Adjusting Stack Tension (A) and Outfeed Tension (B):
•
To increase the conveyor belt tension, add weights to the
conveyor belt take-up
2)
.
•
To decrease the conveyor belt tension, remove weights
from the conveyor belt take-up
2)
.
1)
Only applicable on equipment with active outfeed drive.
2)
Optional or not on all equipment.
Summary of Contents for FoodTech Frigoscandia GYRoCOMPACT M7
Page 1: ...0 INSTALLATION MANUAL Frigoscandia GYRoCOMPACT M7 Spiral Freezer...
Page 2: ...N...
Page 4: ...INSTALLATION 2 2 INTRODUCTION 02 INSTALLATION MANUAL...
Page 6: ...2 2 0000 07 01 01 00 INSTALLATION MANUAL INSTALLATION...
Page 8: ...2 2 0000 07 01 02 00 INSTALLATION MANUAL INSTALLATION...
Page 16: ...10 0000 00 01GB 11 24 SAFETY...
Page 20: ...SAFETY 4 1000 07 01GB 02 03...
Page 34: ...6 INSTALLATION PREPARATIONS 1000 07 01GB 05 03...
Page 42: ...8 DELIVERY INFORMATION 0000 03 01GB 11 09...
Page 44: ...2 INSTALLATION 1000 07 01GB 07 01 INSTALLATION MANUAL...
Page 48: ...2 INSTALLATION 1000 07 01GB 09 03 INSTALLATION MANUAL...
Page 54: ...2 INSTALLATION 1000 07 01GB 12 00 INSTALLATION MANUAL...
Page 58: ...4 INSTALLATION 1000 07 01GB 13 01 INSTALLATION MANUAL...
Page 62: ...2 INSTALLATION 1000 07 01GB 15 00 INSTALLATION MANUAL...
Page 70: ...2 INSTALLATION INSTALLATION MANUAL 1000 07 01GB 18 01...
Page 72: ...2 INSTALLATION 1000 07 01GB 20 00 INSTALLATION MANUAL...
Page 78: ...6 INSTALLATION 1000 07 01GB 22 03 INSTALLATION MANUAL...
Page 90: ...4 INSTALLATION 1000 07 01GB 29 00 INSTALLATION MANUAL...
Page 110: ...6 INSTALLATION 1000 07 01GB 25 01 INSTALLATION MANUAL...
Page 128: ...18 INSTALLATION 1000 07 01GB 26 06...
Page 144: ...2 INSTALLATION 1000 07 01GB 19 00 INSTALLATION MANUAL...
Page 152: ...2 INSTALLATION 1000 07 01GB 36 00 INSTALLATION MANUAL...
Page 194: ...10 221 01GB 03 SERVICE INFO...
Page 200: ...10 171 01GB 02 SERVICE INFO...
Page 222: ...172 347 01GB 00 SERVICE INFO...
Page 230: ...10 039 01GB 03 SERVICE INFORMATION...
Page 256: ...172 CORRECTIVEMAINTENANCE 1000 06 01GB 10 11...
Page 269: ...Automatic Pump Station PZC M1 PZE M2 CIP M3 Directions for use 3 19 EN...
Page 277: ...9 ALTO Danmark A S...