PAGE: 2/2
DOCUMENT NUMBER: 139-01GB-02
REVISION DATE: MARCH , 2008
EQUIPMENT: GC
REVISED BY: JÖNSSOH
SERVICE INFO NUMBER: 139
SERVICE INFORMATION
SJ 155 current relay
Note!
From June 2004 the SJ155 is replaced by the
new DIB01 relay.
Function
When the current is higher than the preset value
the LED illuminates.
When the current drops 10% below the preset
value, the relay is de-energized and the LED is
turned off, see illustration 2.1.
Setting
1.
Set the current limit potentiometer to 0.4 A.
2.
Check that the freezer is cold and the
heating contractor is activated.
3.
Check that the circuit breaker for the door
and infeed heating transformer is activated.
4.
Check that the circuit breakers for door and
infeed heating are activated.
Check that the LED on the current relay is
illuminated.
5.
Turn the current limit potentiometer up very
slowly until the LED is turned off and the
alarm is activated.
6.
Turn the potentiometer back slowly until the
LED is illuminated again.
6.
Check the current function of the relay by
switching off one circuit breaker to the curve
loader heating transformer. The LED must
be turned off and the alarm be activated.
If not, repeat from step 6.
~~~
2.1 Current alarm SJ 155, 0.4 - 2 A.
Summary of Contents for FoodTech Frigoscandia GYRoCOMPACT M7
Page 1: ...0 INSTALLATION MANUAL Frigoscandia GYRoCOMPACT M7 Spiral Freezer...
Page 2: ...N...
Page 4: ...INSTALLATION 2 2 INTRODUCTION 02 INSTALLATION MANUAL...
Page 6: ...2 2 0000 07 01 01 00 INSTALLATION MANUAL INSTALLATION...
Page 8: ...2 2 0000 07 01 02 00 INSTALLATION MANUAL INSTALLATION...
Page 16: ...10 0000 00 01GB 11 24 SAFETY...
Page 20: ...SAFETY 4 1000 07 01GB 02 03...
Page 34: ...6 INSTALLATION PREPARATIONS 1000 07 01GB 05 03...
Page 42: ...8 DELIVERY INFORMATION 0000 03 01GB 11 09...
Page 44: ...2 INSTALLATION 1000 07 01GB 07 01 INSTALLATION MANUAL...
Page 48: ...2 INSTALLATION 1000 07 01GB 09 03 INSTALLATION MANUAL...
Page 54: ...2 INSTALLATION 1000 07 01GB 12 00 INSTALLATION MANUAL...
Page 58: ...4 INSTALLATION 1000 07 01GB 13 01 INSTALLATION MANUAL...
Page 62: ...2 INSTALLATION 1000 07 01GB 15 00 INSTALLATION MANUAL...
Page 70: ...2 INSTALLATION INSTALLATION MANUAL 1000 07 01GB 18 01...
Page 72: ...2 INSTALLATION 1000 07 01GB 20 00 INSTALLATION MANUAL...
Page 78: ...6 INSTALLATION 1000 07 01GB 22 03 INSTALLATION MANUAL...
Page 90: ...4 INSTALLATION 1000 07 01GB 29 00 INSTALLATION MANUAL...
Page 110: ...6 INSTALLATION 1000 07 01GB 25 01 INSTALLATION MANUAL...
Page 128: ...18 INSTALLATION 1000 07 01GB 26 06...
Page 144: ...2 INSTALLATION 1000 07 01GB 19 00 INSTALLATION MANUAL...
Page 152: ...2 INSTALLATION 1000 07 01GB 36 00 INSTALLATION MANUAL...
Page 194: ...10 221 01GB 03 SERVICE INFO...
Page 200: ...10 171 01GB 02 SERVICE INFO...
Page 222: ...172 347 01GB 00 SERVICE INFO...
Page 230: ...10 039 01GB 03 SERVICE INFORMATION...
Page 256: ...172 CORRECTIVEMAINTENANCE 1000 06 01GB 10 11...
Page 269: ...Automatic Pump Station PZC M1 PZE M2 CIP M3 Directions for use 3 19 EN...
Page 277: ...9 ALTO Danmark A S...