PAGE: 8/10
DOCUMENT NUMBER: 307-01GB-00
REVISION DATE: APRIL, 2009
EQUIPMENT: GENERAL
REVISED BY: JOHNY SORÄNG
SERVICE INFO NUMBER: 307
SERVICE INFORMATION
Main Menu
Start the Main Menu mode is by pressing the
Main Menu key.
Each parameter has a name and number which
remain the same regardless of the programming
mode. In the Main Menu mode, the parameters
are divided into groups. The first digit of the
parameter number (from the left) indicates the
parameter group number.
All parameters can be changed in the Main
Menu. However, depending on the choice of
configuration (par. 1-00), some parameters can
be "missing". E.g. open loop hides all the PID
parameters, and other enabled options make
more parameter groups visible.
Parameter Selection
In the Main menu mode, the parameters are
divided into groups. Select a parameter group
using the navigation keys. The following param-
eter groups are accessible:
Group no.
Parameter group:
0
Operation/Display
1
Load/Motor
2
Brakes
3
References/Ramps
4
Limits/Warnings
5
Digital In/Out
6
Analog In/Out
7
Controls
8
Comm. and Options
9
Profibus
10
CAN Fieldbus
11
Reserved Com. 1
12
Reserved Com. 2
Summary of Contents for FoodTech Frigoscandia GYRoCOMPACT M7
Page 1: ...0 INSTALLATION MANUAL Frigoscandia GYRoCOMPACT M7 Spiral Freezer...
Page 2: ...N...
Page 4: ...INSTALLATION 2 2 INTRODUCTION 02 INSTALLATION MANUAL...
Page 6: ...2 2 0000 07 01 01 00 INSTALLATION MANUAL INSTALLATION...
Page 8: ...2 2 0000 07 01 02 00 INSTALLATION MANUAL INSTALLATION...
Page 16: ...10 0000 00 01GB 11 24 SAFETY...
Page 20: ...SAFETY 4 1000 07 01GB 02 03...
Page 34: ...6 INSTALLATION PREPARATIONS 1000 07 01GB 05 03...
Page 42: ...8 DELIVERY INFORMATION 0000 03 01GB 11 09...
Page 44: ...2 INSTALLATION 1000 07 01GB 07 01 INSTALLATION MANUAL...
Page 48: ...2 INSTALLATION 1000 07 01GB 09 03 INSTALLATION MANUAL...
Page 54: ...2 INSTALLATION 1000 07 01GB 12 00 INSTALLATION MANUAL...
Page 58: ...4 INSTALLATION 1000 07 01GB 13 01 INSTALLATION MANUAL...
Page 62: ...2 INSTALLATION 1000 07 01GB 15 00 INSTALLATION MANUAL...
Page 70: ...2 INSTALLATION INSTALLATION MANUAL 1000 07 01GB 18 01...
Page 72: ...2 INSTALLATION 1000 07 01GB 20 00 INSTALLATION MANUAL...
Page 78: ...6 INSTALLATION 1000 07 01GB 22 03 INSTALLATION MANUAL...
Page 90: ...4 INSTALLATION 1000 07 01GB 29 00 INSTALLATION MANUAL...
Page 110: ...6 INSTALLATION 1000 07 01GB 25 01 INSTALLATION MANUAL...
Page 128: ...18 INSTALLATION 1000 07 01GB 26 06...
Page 144: ...2 INSTALLATION 1000 07 01GB 19 00 INSTALLATION MANUAL...
Page 152: ...2 INSTALLATION 1000 07 01GB 36 00 INSTALLATION MANUAL...
Page 194: ...10 221 01GB 03 SERVICE INFO...
Page 200: ...10 171 01GB 02 SERVICE INFO...
Page 222: ...172 347 01GB 00 SERVICE INFO...
Page 230: ...10 039 01GB 03 SERVICE INFORMATION...
Page 256: ...172 CORRECTIVEMAINTENANCE 1000 06 01GB 10 11...
Page 269: ...Automatic Pump Station PZC M1 PZE M2 CIP M3 Directions for use 3 19 EN...
Page 277: ...9 ALTO Danmark A S...