SAFETY INSTRUCTION FOR INSTALLATION
This document lists the safety rules that apply when installing
the equipment. If you follow these rules, you will minimize the
risk of injuring yourself and damaging the equipment.
General
•
Agree on a safety plan for the site with the customer and
other contractors before the work starts.
•
Inform yourself about first aid equipment, fire alarms, fire-
extinguisher etc.
•
Keep working areas clean and well organised.
•
Make sure that the installation area is marked off and keep
non-authorised personnel out of that area.
•
Report any unsafe conditions or acts to the customer and
your supervisor. If there is a safety risk, stop the work.
•
Obey non smoking signs.
•
Consult the Local and National safety policies for further
details.
Note!
Only use well trained and authorized personnel when working
with JBT FoodTech equipment.
Personnel safety
•
Personnel Protective Equipment (PPE) must be worn and in
the correct manner.
•
Do not enter any heights without access to proper hand
rails if the height is over 2 meters (4 ft. in US), unless using
a body harness and an appropriate arrest line.
•
Do not spend more time than necessary inside the enclo
-
sure when the equipment is operated in any way. Use the
service handle/running device according to separate in-
struction.
•
Anyone who disconnects a safety device is responsible for
the safety of themselves and others.
•
Always inform the personnel that are in charge of the safety
support that work with the equipment is in progress.
•
JBT FoodTech personnel are not allowed to work alone
under any circumstances.
Emergency plan
•
Keep first aid kits, emergency telephone numbers and cus
-
tomer address at a well known and easily reached location
at the work-site.
Summary of Contents for FoodTech Frigoscandia GYRoCOMPACT M7
Page 1: ...0 INSTALLATION MANUAL Frigoscandia GYRoCOMPACT M7 Spiral Freezer...
Page 2: ...N...
Page 4: ...INSTALLATION 2 2 INTRODUCTION 02 INSTALLATION MANUAL...
Page 6: ...2 2 0000 07 01 01 00 INSTALLATION MANUAL INSTALLATION...
Page 8: ...2 2 0000 07 01 02 00 INSTALLATION MANUAL INSTALLATION...
Page 16: ...10 0000 00 01GB 11 24 SAFETY...
Page 20: ...SAFETY 4 1000 07 01GB 02 03...
Page 34: ...6 INSTALLATION PREPARATIONS 1000 07 01GB 05 03...
Page 42: ...8 DELIVERY INFORMATION 0000 03 01GB 11 09...
Page 44: ...2 INSTALLATION 1000 07 01GB 07 01 INSTALLATION MANUAL...
Page 48: ...2 INSTALLATION 1000 07 01GB 09 03 INSTALLATION MANUAL...
Page 54: ...2 INSTALLATION 1000 07 01GB 12 00 INSTALLATION MANUAL...
Page 58: ...4 INSTALLATION 1000 07 01GB 13 01 INSTALLATION MANUAL...
Page 62: ...2 INSTALLATION 1000 07 01GB 15 00 INSTALLATION MANUAL...
Page 70: ...2 INSTALLATION INSTALLATION MANUAL 1000 07 01GB 18 01...
Page 72: ...2 INSTALLATION 1000 07 01GB 20 00 INSTALLATION MANUAL...
Page 78: ...6 INSTALLATION 1000 07 01GB 22 03 INSTALLATION MANUAL...
Page 90: ...4 INSTALLATION 1000 07 01GB 29 00 INSTALLATION MANUAL...
Page 110: ...6 INSTALLATION 1000 07 01GB 25 01 INSTALLATION MANUAL...
Page 128: ...18 INSTALLATION 1000 07 01GB 26 06...
Page 144: ...2 INSTALLATION 1000 07 01GB 19 00 INSTALLATION MANUAL...
Page 152: ...2 INSTALLATION 1000 07 01GB 36 00 INSTALLATION MANUAL...
Page 194: ...10 221 01GB 03 SERVICE INFO...
Page 200: ...10 171 01GB 02 SERVICE INFO...
Page 222: ...172 347 01GB 00 SERVICE INFO...
Page 230: ...10 039 01GB 03 SERVICE INFORMATION...
Page 256: ...172 CORRECTIVEMAINTENANCE 1000 06 01GB 10 11...
Page 269: ...Automatic Pump Station PZC M1 PZE M2 CIP M3 Directions for use 3 19 EN...
Page 277: ...9 ALTO Danmark A S...