2 Installation
- 32 -
Step 11. Installation is completed.
■
Cabinet Installation of the vertical tower unit (90–160 kW)
b
a
c
d
e
Step 1. Hoist the drive unit into the cabinet by using the lifting holes (e) with hoisting
equipment;
Step 2. Tighten the screw (d) to fix the drive unit;
Step 3. Install the terminal plug (c) for the external IO and control power supply;
Step 4. Connect all control cables. Put all the cables on one side and fasten them so that
they are not in the way.
Step 5. Tighten the three screws (b) for the front air separator.