7 OPERATION PROCEDURES
- 68 -
7.1 Overview
Operations should be carried out as flowcharted below. The user program (application) needs
to be loaded only when you run the programmable controller for the first time. (It will be
backed up by the battery thereafter.) For details, refer to software manual supplied with the
programming tool.
①
The ladder and HI-FLOW need to be loaded only when you run the programmable
controller the first time. Reload them if you have remade the programmable controller
thereafter.
②
The application task, too, needs to be loaded only when you run the programmable
controller for the first time. If the application task has to be reloaded for reasons, such as
remaking to the programmable controller, abort all existing tasks and then reload the
application task. Tasks are running even when the CPU key switch is in the STOP
position as indicated in the table below. Rewriting a running task may result in a CPU
error.
Relationship between the CPU switch and application software
STOP
RUN
SIMU.RUN
Ladder and HI-FLOW
Stopped
Running
Running
Application task
Running
Running
Running
Power-on
Load application
(ladder, HI-FLOW)
Abort all existing tasks
Load application task
Run program
①
②
CPU switch
Application
Summary of Contents for S10mini D
Page 1: ......
Page 14: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 19: ...1 BEFORE USE ...
Page 28: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 29: ...2 OVERVIEW ...
Page 34: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 35: ...3 NAMES AND FUNCTIONS OF PARTS ...
Page 45: ...4 INSTALLATION ...
Page 54: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 55: ...5 WIRING ...
Page 68: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 69: ...6 SETTING ...
Page 84: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 85: ...7 OPERATION PROCEDURES ...
Page 91: ...8 EXPLANATION OF OPERATION ...
Page 111: ...9 MAINTENANCE ...
Page 128: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 129: ...10 SPECIFICATIONS ...