8 EXPLANATION OF OPERATION
- 87 -
Current consumptions of available option modules
Description
Model
Module REV
Current consumption
LQP000
Before the [H]
LQP010
Before the [H]
LQP011
Before the [I]
LQP120
Before the [F]
1500 mA or less
LQP000
[I] or later
LQP010
[I] or later
LQP011
[J] or later
CPU
LQP120
[G] or later
1630 mA or less
Description
Model
Current consumption
FL.NET
LQE000/LQE500
725 mA or less
OD.RING (4 km)
LQE010/LQE510
715 mA or less
OD.RING (1 km)
LQE015/LQE515
715 mA or less
ET.NET
LQE020/LQE520
725 mA or less
SV.LINK
LQE021/LQE521
725 mA or less
SD.LINK
LQE030/LQE530
1160 mA or less
J.NET
LQE040/LQE540
820 mA or less
J.NET-INT
LQE045/LQE545
820 mA or less
IR.LINK
LQE046/LQE546
820 mA or less
CPU.LINK
LQE050/LQE550
445 mA or less
RS-232C
LQE160/LQE560
410 mA or less
RS-422
LQE165/LQE565
420 mA or less
D.NET
LQE170/LQE570
510 mA or less
D.NET (power supplied
from on extenal source)
LQE175/LQE575
460 mA or less
When designing unit installation, always calculate the total current consumption of the CPU
module, option modules and I/O modules and ensure the total consumption does not exceed
the rated output of the power supply module.
If the total current consumption exceeds the rated output current of the power supply
module, divide the modules into units.
Summary of Contents for S10mini D
Page 1: ......
Page 14: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 19: ...1 BEFORE USE ...
Page 28: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 29: ...2 OVERVIEW ...
Page 34: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 35: ...3 NAMES AND FUNCTIONS OF PARTS ...
Page 45: ...4 INSTALLATION ...
Page 54: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 55: ...5 WIRING ...
Page 68: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 69: ...6 SETTING ...
Page 84: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 85: ...7 OPERATION PROCEDURES ...
Page 91: ...8 EXPLANATION OF OPERATION ...
Page 111: ...9 MAINTENANCE ...
Page 128: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 129: ...10 SPECIFICATIONS ...