2. Unit Installation
27
SMGB0079 rev.0 - 01/2013
2
Suspended unit
1
Suspend the unit as shown in the figures.
2
Ensure that wall can withstand the weight of the outdoor unit indicated on the specifications plate.
3
It is advisable that each foot support should bear the full weight of the unit (in order take account of applied stress
fatigue when unit is operating).
RAS-3HVNPE
RAS-(4-6)H(V)NPE
RAS-(4-6)H(V)NCE
RAS-(8-10)HN(P/C)E
RAS-12HN(P/C)
1
2
3
1
2
3
1. Wall support (field supplied)
2. Anchor bolts (field supplied)
C A U T I O N
•
Follow these installation procedures carefully
-
The installation must be done so as to ensure that the outdoor unit does not lean vibrate make a noise or
fall in the event of strong gusts of wind or earthquakes. Calculate the resistance to vibration (caused by
earthquakes) to guarantee that the installation is sturdy enough to prevent falls. Secure the unit with cables
(field-supplied) when installing the unit in a place without walls or wind protection and where it is likely to
be exposed to gusts of wind.
-
When using the vibration-proof rubber mat secure it at four points on the front and back.
Summary of Contents for EV-1.5N1
Page 2: ......
Page 4: ... II ...
Page 26: ......
Page 100: ......
Page 144: ...5 Control System 130 SMGB0079 rev 0 01 2013 5 4 2 Dry operation Continues in the next page ...
Page 148: ...5 Control System 134 SMGB0079 rev 0 01 2013 5 4 4 Automatic cooling and heating operation ...
Page 158: ......
Page 196: ......
Page 212: ...8 Troubleshooting 198 SMGB0079 rev 0 01 2013 ...
Page 215: ...8 Troubleshooting 201 SMGB0079 rev 0 01 2013 8 ...
Page 323: ...9 Spare parts 309 SMGB0079 rev 0 01 2013 9 RAS 8 10 HNCE Spare Parts Document EPN 201211B ...
Page 332: ......
Page 452: ......
Page 479: ......