8. Troubleshooting
243
SMGB0079 rev.0 - 01/2013
8
Are the power wires
passed through
CT(inverter element)?
Pass the power
wires through CT
Check transistor
module (*1) (*2)
Check inverter
PCB
Replace transistor
and inverter
Replace transistor
module
Apply silicon to cover
entirely the space
Is the space between
the transistor module
and radiation fins entirely
covered by silicon?
N O T E
•
*1) Perform the high voltage discharge work by referring to the item
Procedure of checking other main parts
,
before checking and replacing the inverter components.
•
*2) Regarding replacing or checking method for inverter components, refer to item
Procedure of checking
other main parts
.
•
*3) Turn ON the No.1 switch of the dip switch DSW1 on PCB2 (inverter) when restarting with disconnecting the
terminals of the compressor. After troubleshooting, turn OFF the No.1 switch of the dip switch DSW1 on PCB2.
•
When the alarm code “53” is indicated, the outdoor fan motor (DC motor) ensure that DC fan motor is checked
according to the item
Procedure of checking other main parts
.
Summary of Contents for EV-1.5N1
Page 2: ......
Page 4: ... II ...
Page 26: ......
Page 100: ......
Page 144: ...5 Control System 130 SMGB0079 rev 0 01 2013 5 4 2 Dry operation Continues in the next page ...
Page 148: ...5 Control System 134 SMGB0079 rev 0 01 2013 5 4 4 Automatic cooling and heating operation ...
Page 158: ......
Page 196: ......
Page 212: ...8 Troubleshooting 198 SMGB0079 rev 0 01 2013 ...
Page 215: ...8 Troubleshooting 201 SMGB0079 rev 0 01 2013 8 ...
Page 323: ...9 Spare parts 309 SMGB0079 rev 0 01 2013 9 RAS 8 10 HNCE Spare Parts Document EPN 201211B ...
Page 332: ......
Page 452: ......
Page 479: ......