10. Servicing
329
SMGB0079 rev.0 - 01/2013
10
7
Hold and disconnect the coil of the expansion valve.The expansion valve coil is equipped with a lock mechanism.En-
sure that the coil is locked when replacing.
1. One terminal cover screw.
2. Side cover.
3. Seven side cover screws.
4. Three front cover screws.
1. Expansion valve coil.
2. Expansion valve body.
N O T E
DO NOT touch electrical components while the LED1 (Red) is ON to avoid electrical shock. Wait until the LED
turns off.
10.2.8 Removing electrical components
Removing Electrical Box
1
Remove the pipe cover following
Removing pipe cover
.
2
Remove 3 fixing screws and remove the upper cover.
3
Remove the electrical box cover.
4
Remove 1 fixing screw and remove the terminal cover.
5
Disconnect all the wiring connected to the control PCB.
6
Remove 2 screws which fix the electrical box.
Summary of Contents for EV-1.5N1
Page 2: ......
Page 4: ... II ...
Page 26: ......
Page 100: ......
Page 144: ...5 Control System 130 SMGB0079 rev 0 01 2013 5 4 2 Dry operation Continues in the next page ...
Page 148: ...5 Control System 134 SMGB0079 rev 0 01 2013 5 4 4 Automatic cooling and heating operation ...
Page 158: ......
Page 196: ......
Page 212: ...8 Troubleshooting 198 SMGB0079 rev 0 01 2013 ...
Page 215: ...8 Troubleshooting 201 SMGB0079 rev 0 01 2013 8 ...
Page 323: ...9 Spare parts 309 SMGB0079 rev 0 01 2013 9 RAS 8 10 HNCE Spare Parts Document EPN 201211B ...
Page 332: ......
Page 452: ......
Page 479: ......