10. Servicing
415
SMGB0079 rev.0 - 01/2013
10
10.4.2.8 Removing High pressure switch and pressure switch for control
1
Remove the service cover following
Removing service cover
in this chapter.
2
Collect the refrigerant from the check joint according to
Removing the compressor
,
in this chapter.
3
Disconnect the Faston Terminals of High Pressure Switch and Pressure sensor for PD control.
4
Remove the high pressure switch and the pressure switch for control from the brazed part of discharge piping.
Discharge pipe
Brazing part
Brazing part
High pressure
switch
Pressure sensor
for control
10.4.2.9 Opening electrical box (P-Mounting Plate)
1
Remove the service cover following
Removing service cover
in this chapter.
2
Remove 6 screws which fix the electrical box and open the P plate turning counter clockwise approximately 90°.
• Check that the LED201 (red) on the inverter PCB (PCB2) is OFF when opening P-mounting plate.
2 fixing
screws
Power plate
Upper cover
2 fixing
screws
2 fixing
screws
D A N G E R
DO NOT touch electrical components while the LED201 (Red) or LED1 (Red) are ON to avoid electrical shock. Wait
until the LEDs turn off.
Summary of Contents for EV-1.5N1
Page 2: ......
Page 4: ... II ...
Page 26: ......
Page 100: ......
Page 144: ...5 Control System 130 SMGB0079 rev 0 01 2013 5 4 2 Dry operation Continues in the next page ...
Page 148: ...5 Control System 134 SMGB0079 rev 0 01 2013 5 4 4 Automatic cooling and heating operation ...
Page 158: ......
Page 196: ......
Page 212: ...8 Troubleshooting 198 SMGB0079 rev 0 01 2013 ...
Page 215: ...8 Troubleshooting 201 SMGB0079 rev 0 01 2013 8 ...
Page 323: ...9 Spare parts 309 SMGB0079 rev 0 01 2013 9 RAS 8 10 HNCE Spare Parts Document EPN 201211B ...
Page 332: ......
Page 452: ......
Page 479: ......