Measurement process
Measurement process
This section describes voltage measurement as performed in a typical application.
Example use: Measuring a battery’s voltage
Preparations
(1) Position the instrument as desired.
50 mm or more
50 mm or more
150 mm or more
Rear
(2) Perform the pre-measurement inspection.
(3) Connect the power cord.
(4)
Connect the measurement cables to the measurement terminals.
(5)
Connect the temperature sensor to the TEMP.SENSOR connector.
(When performing temperature measurement or using the temperature compensation)
(6) Configure and connect the external interface (as necessary).
• Using the USB interface (p. 98)
• Using the RS-232C interface (p. 100)
• Using the GP-IB interface (p. 102)
• Using the LAN interface (p. 104)
• Using a USB flash drive (p. 115)
• Using the EXT I/O connector (p. 125)