Ultra Heat GMV VRF Technical Service Manual INSTALLATION
33
PART 4 REQUIREMENTS ON FOUNDATION INSTALLATION
1 ODU FOUNDATION
The concrete foundation of the ODU must be strong enough. Ensure that the drainage is smooth
and that the ground drainage or floor drainage is not affected.
Requirements on the concrete foundation are as follows:
The concrete foundation must be flat and have enough rigidity and strength to undertake the
unit’s weight during running. The height of the foundation is 200 mm (7.87inch) to 300 mm
(11.8inch), which is based on the size of the unit.
The proportion of the cement, sand, and stone for the concrete is 1:2:4. Place 10 reinforced steel
bars (φ10 mm) with a space between of 30 mm.
Use the mortar to flatten the surface of the foundation. Sharp edges must be chamfered.
When the foundation is built on a concrete floor, crushed stones are not required. But the
foundation surface must be roughened.
Clear the oil stains, crushed stones, dirt, and water in the reserved bolt hole of the foundation
and install a temporary cover before installing bolts.
Build a drainage ditch around the foundation to discharge the condensate water.
If the air conditioner is installed on the roof, check the intensity of the building and take
waterproof measures.
If a u-steel foundation is adopted, the structure must be designed with sufficient rigidity and
strength.
①
Install where it can sufficiently support the weight of the outdoor unit. If the support strength is
not enough, the outdoor unit may drop and hurt people.
②
Install where the outdoor unit may not fall in strong wind or earthquake. If there is a fault in the
supporting conditions, the outdoor unit may fall and hurt people.
③
Please take extra cautions on the supporting strength of the ground, liquid outlet treatment
Summary of Contents for Ultra Heat GMV-V72W/A-F
Page 1: ...Ultra Heat GMV Multi VRF TECHNICAL SERVICE MANUAL R410A Heat Pump Series...
Page 22: ...Ultra Heat GMV VRF Technical Service Manual INSTALLATION 17 CHAPTER 2 INSTALLATION...
Page 26: ...Ultra Heat GMV VRF Technical Service Manual INSTALLATION 21...
Page 105: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 100 CHAPTER 4 MAINTENANCE...
Page 116: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 111...
Page 180: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 175 CHAPTER 5 REMOTE CONTROL...
Page 206: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 201...
Page 239: ......
Page 240: ...Jf00303483...