Ultra Heat GMV VRF Technical Service Manual INSTALLATION
29
drill, air screw driver and screwdriver.
3) Basic operation of connecting an ODU to static pressure ventilating duct
Two methods are available to connect an ODU to static pressure ventilating duct.
Method 1: Reserve the unit top case. Detailed operations are as follows:
a). Install the ODU (2) and steel-plate ventilating duct (1). Use an air screw driver or screwdriver to
unfasten the tapping screws that fixing the top case component (3), and then remove the top case
component. Take out the grille from the top of the top case component and leave the top case.
b). Put the canvas casing inside out (4). Cover one end of the canvas casing over the unit
downward until the canvas end face is aligned with the unit or a bit higher than the top of the unit. Then,
put the top case back (3) and tightly press the canvas casing (4). Use tapping screws to fix the top case
onto the unit (3).
c). Pull up the canvas casing reversely (4) and use the steel bar (5) to press the canvas casing
tightly onto the counter flange of the steel-plate ventilating duct (1). Use a hand-operated electric drill to
drill holes and fasten the parts by using tapping screws.
d). Use the tin foil to seal the joints and check the joints' reliability.
Step 1 Step 2
Step 3 Step 4
Summary of Contents for Ultra Heat GMV-V72W/A-F
Page 1: ...Ultra Heat GMV Multi VRF TECHNICAL SERVICE MANUAL R410A Heat Pump Series...
Page 22: ...Ultra Heat GMV VRF Technical Service Manual INSTALLATION 17 CHAPTER 2 INSTALLATION...
Page 26: ...Ultra Heat GMV VRF Technical Service Manual INSTALLATION 21...
Page 105: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 100 CHAPTER 4 MAINTENANCE...
Page 116: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 111...
Page 180: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 175 CHAPTER 5 REMOTE CONTROL...
Page 206: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 201...
Page 239: ......
Page 240: ...Jf00303483...