Ultra Heat GMV VRF Technical Service Manual MAINTENANCE
148
10. Fix and wire the electric
box.
●Put the electric box back to original position
and screw it.
●Connect all lines.
11. Check and then install
the front panels.
●Check various parts and connecting lines.
●If no problem is found, hook the front panels
and tighten the screws.
Four-way valve
Precondition: No refrigerant exists in the pipeline system and the power supply has been disconnected
Step
Diagram
Operation Procedure
1. Remove the front panels.
●Use a screwdriver to unscrew the upper and
lower front panels.
●Lift the front panels in order to take it out.
Note: Both the upper panel and lower panel
are fixed with two fasteners respectively to
connect to the side panels.
2. Remove the electric box.
●Disconnect internal and external connecting
lines of the electric box.
●Protect the internal parts during the
disassembly.
Summary of Contents for Ultra Heat GMV-V72W/A-F
Page 1: ...Ultra Heat GMV Multi VRF TECHNICAL SERVICE MANUAL R410A Heat Pump Series...
Page 22: ...Ultra Heat GMV VRF Technical Service Manual INSTALLATION 17 CHAPTER 2 INSTALLATION...
Page 26: ...Ultra Heat GMV VRF Technical Service Manual INSTALLATION 21...
Page 105: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 100 CHAPTER 4 MAINTENANCE...
Page 116: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 111...
Page 180: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 175 CHAPTER 5 REMOTE CONTROL...
Page 206: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 201...
Page 239: ......
Page 240: ...Jf00303483...