II
2.2 Requirements on Installation
2.4 Requirements on Installation of Drain Pipes for Different Types of IDUs
2.5 Requirements on Independent Drainage for Each IDU
........................................................ 53
2.6 Requirements on Centralized Drainage for IDUs
................................................................... 53
3.1 Insulation for the Refrigerant Pipe System
............................................................................. 53
3.2 Insulation for the Condensate Water Pipe System
................................................................ 54
PART 7 ELECTRIC AND CONTROLLER INSTALLATION
.................................................................... 56
2 INSTALLATION OF THE POWER CABLE
............................................................................................. 57
2.2 Requirements on Power Cable Configuration
........................................................................ 57
2.3 Procedure for Installing the Power Cable
................................................................................ 58
3 INSTALLATION OF THE COMMUNICATION SYSTEM
....................................................................... 60
3.1 Connection of Communication Cable Terminals
................................................................... 61
3.2 Connection of Communication Cables
.................................................................................... 61
3.3 Communication Cable Connection Method and Procedure
............................................... 61
PART 8 VACUUMIZATION AND DESICCATION FOR THE REFRIGERANT SYSTEM
1.1 Importance of the Air-tightness Test
......................................................................................... 65
1.2 Procedure for Performing the Air-tightness Test
................................................................... 65
2 VACUUMIZATION AND DESICCATION FOR THE SYSTEM
............................................................. 66
2.1 Requirements on the Vacuum Pump
......................................................................................... 66
2.2 Procedure and Precautions for Vacuumization and Desiccation
...................................... 66
1 CALCULATION METHOD FOR PERFUSING REFRIGERANT
......................................................... 68
2 METHOD FOR PERFUSING REFRIGERANT
....................................................................................... 69
2.2 Refrigerant Perfusion During Running
..................................................................................... 70
CHAPTER 3 COMMISSIONING OPERATION
1 PRECAUTIONS FOR CONSTRUCTION
................................................................................................ 73
2 PRECAUTIONS FOR THE USE OF REFRIGERANTS
........................................................................ 73
3.1 System Function DIP Switch Settings
...................................................................................... 74
3.2 System Function Button Operations
........................................................................................ 77
3.3 Function Setting Operations
3.4 Basic Operations for Engineering Commissioning
.............................................................. 81
1 NECESSITY OF VRF ENGINEERING COMMISSIONING
.................................................................. 83
2 REQUIRED FILES AND TOOLS FOR ENGINEERING DEBUGGING
.............................................. 83
2.1 Required Tools for Engineering Commissioning
.................................................................. 83
3 ENGINEERING COMMISSIONING PROCEDURES
............................................................................. 84
3.1 Pre-commissioning Preparations
.............................................................................................. 84
Summary of Contents for Ultra Heat GMV-V72W/A-F
Page 1: ...Ultra Heat GMV Multi VRF TECHNICAL SERVICE MANUAL R410A Heat Pump Series...
Page 22: ...Ultra Heat GMV VRF Technical Service Manual INSTALLATION 17 CHAPTER 2 INSTALLATION...
Page 26: ...Ultra Heat GMV VRF Technical Service Manual INSTALLATION 21...
Page 105: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 100 CHAPTER 4 MAINTENANCE...
Page 116: ...Ultra Heat GMV VRF Technical Service Manual MAINTENANCE 111...
Page 180: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 175 CHAPTER 5 REMOTE CONTROL...
Page 206: ...Ultra Heat GMV VRF Technical Service Manual REMOTE CONTROL 201...
Page 239: ......
Page 240: ...Jf00303483...