GE H
EALTHCARE
D
IRECTION
FQ091013, R
EVISION
1
V
IVID
I
N
AND
V
IVID
Q
N S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-31
5.) Lift the P&M Board
upwards
away from the Bottom Assembly and remove it completely, as shown
.
8-3-1-5
P&M (Probe and MUX) Board Installation Procedure
NOTE:
When performing the following installation procedure steps, it may be helpful to review the appropriate
movie clips previously referenced in the
P&M (Probe and MUX) Board Removal Procedure
.
CAUTION:
When installing boards, ESD may cause damage to a board. Always have the ESD hand
strip connected to the machine chassis and to your hand.
1) Return a new P&M Board to the system, pushing it
downwards
into position on the Bottom
Assembly. Make sure it is properly seated before returning and fastening the two screws (previously
removed). Refer to
and
2.) Return and fasten the four screws to secure the P&M Board to the RFI Board, as shown in
.
3.) Return the Control Panel and Keyboard, as described in the
Installation Procedure on page 8 - 11
4.) Return the bearing handle, as described in the
Bearing Handle Installation Procedure on page 8 - 4
.
5.) Proceed to perform the following functionality tests:
-
SafeLock Cart - Grounding Continuity on page 10 - 23
- only if the Vivid
i
n/ Vivid q N system
is currently mounted on the SafeLock cart
-
SafeLock Cart - Chassis Current Leakage Test on page 10 - 25
-
Calibration Tests on page 7 - 25
-
Full System Test on page 7 - 10
Figure 8-35 Removing the Probe and MUX Board from the Bottom Assembly
Summary of Contents for Vivid in
Page 2: ......
Page 30: ...GE HEALTHCARE DIRECTION FQ091013 REVISION 1 VIVID I N AND VIVID Q N SERVICE MANUAL xxviii...
Page 739: ......