GE Analytical Instruments ©2010
47 of 226
DLM 74001-04 Rev. A
Chapter 3: Installation
Additional Installation Equipment
To install the Sievers 500 RL On-Line TOC Analyzer, the following equipment also is required:
•
Mounting hardware to support the Analyzer (see “Step 3: Select a Location for the Analyzer” on page 47)
•
Insulated wire, 22-12 AWG, rated to 300 Volts for analog and alarm outputs (optional; see “Installing the
Analog Outputs and Alarms” on page 49)
•
Analog (4-20 mA) recorder (optional)
•
Insulated wire (18-12 AWG, rated to 300 Volts) for AC power conduit (see “Connecting to a Power
Supply” on page 48)
•
An external circuit breaker or switch that disconnects both poles of the supply voltage, rated
appropriately
•
Ethernet cable (optional)
Step 2: Complete the Identification Records
Complete the Identification Records section on “Identification Records” on page 2 by recording the date of
receipt and the Analyzer serial number (found on the side of the Analyzer).
Step 3: Select a Location for the Analyzer
The Sievers 500 RL On-Line TOC Analyzer is designed to be mounted on a wall or support stand. Allow a
minimum of
5 cm
clearance between the back of the Analyzer and the wall for heat dissipation; allow
30
.5 cm
of
clearance on the sides, top, and bottom of the analyzer for the plumbing and electrical connections.
Additionally, this clearance provides for the proper circulation for temperature and humidity control. When
selecting the location, mount the Analyzer so that the display screen is approximately at eye-level. Diagrams
showing Analyzer dimensions and clearances are provided in "Appendix A: Analyzer Dimension Diagrams" on
page 171.
Hardware for mounting the Analyzer on a wall or instrument rack is not included in the accessories kit.
Hardware should be selected based on site-specific circumstances. Mounting hardware must be able to support
four times the weight of the unit; thus you should install mounting bolts capable of supporting 67.6 kg (148.8 lbs).
Avoid direct sunlight and extreme temperatures; operating at elevated temperatures greater than 40 °C (104 °F)
prevents proper operation, and operating at low temperatures, 10 °C (50 °F), can cause errors in the
measurements. The Sievers 500 RL On-Line TOC Analyzer withstands the hazards of industrial process
environments, and the Analyzer enclosure is rated IP 45.
Summary of Contents for Sievers 500 RL
Page 8: ...GE Analytical Instruments 2010 8 of 226 DLM 74001 04 Rev A ...
Page 10: ...GE Analytical Instruments 2010 10 of 226 DLM 74001 04 Rev A ...
Page 36: ...GE Analytical Instruments 2010 36 of 220 DLM 74001 04 Rev A ...
Page 66: ...GE Analytical Instruments 2010 66 of 226 DLM 74001 04 Rev A Chapter 3 Installation ...
Page 152: ...GE Analytical Instruments 2010 152 of 226 DLM 74001 04 Rev A Chapter 7 Maintenance ...
Page 170: ...GE Analytical Instruments 2010 170 of 226 DLM 74001 04 Rev A Chapter 8 Troubleshooting ...
Page 178: ...Appendix A GE Analytical Instruments 2010 178 of 186 DLM 74001 04 Rev A ...
Page 185: ...Notes GE Analytical Instruments 2010 185 of 186 DLM 74001 04 Rev A 186 ...
Page 186: ...Notes GE Analytical Instruments 2010 186 of 186 DLM 74001 04 Rev A 186 ...