GE
RAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
8-142
Section 8-28 - Replacement of the Harness Cable and OPIO Cable Assy
Section 8-28
Replacement of the Harness Cable and OPIO Cable Assy
8-28-1
Manpower
1 person, 30 minutes
8-28-2
Tools
Standard Phillips Screwdriver, Nipper, 4mm Hex Wrench, 3 Cable ties (GEPN: 2160955).
8-28-3
Pre-Work
1) Rear Cover removed. (refer to
)
2) OPIO removed. (refer to
)
3) LCD Monitor removed and Covers from LCD Arm removed. (refer to
)
4) Main monitor cables disconnected. (refer to
)
5) All monitor and OPIO cables on rear connectors are disconnected. (refer to
)
6) Link arm top cover removed. (refer to
)
8-28-4
Removal Procedure (Harness Cable Assy)
1) Loosen Cable through 3rd Arm (1).
2) Remove 2 Cable ties and loosen Cable from 2nd Arm.
NOTE:
There is cable position marker at this location.
3) Remove 1 Cable tie and loosen Cable from 1st Arm.
4) Loosen cable around 2nd and 1st Axis as following figure.
5) Unscrew 1 screw and carefully lift up arms and loosen all cables.
NOTE:
There is cable position marker at this location.
6) Release the cable holder and carefully pull down cables.
7) Unscrew 2 screws and remove Link arm cable fix brkt.
8) Carefully pull up cables and remove cables