GE
DRAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-117
8-17-17
Installation Procedure - MPI, MCB, MDC, DC4D, HDD, Battery and COM Express
1) Parts to be installed in reverse order of removal.
8-17-18
Functional Check - MPI, MCB, MDC, IO Box
for Functional Diag Test List
8-17-19
Removal Procedure - MBP assy
1) Remove Nest Box from system.
2) Remove MPI, MCB and IO Box out of Nest Frame
3) Remove 4 screws (Circle) and fan connector (Square).
Figure 8-136 Screw points and connector point to remove MBP
4) Remove 6 screws.
Figure 8-137 Screw points to remove MBP
8-17-20
Installation Procedure - MBP assy
Parts to be installed in reverse order of removal.
8-17-21
Functional Check
for Functional Diag Test List.