GE
DRAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
Chapter 4 - Functional Checks
4-14
Figure 4-12 On/Off Button on Control Panel and indicator color
6) Verify
On/Off
button color changes to GREEN.
7) Verify on-board peripherals power is also turned ON.
As soon as the software is loaded, the system enters 2D-Mode with the probe and application that were
used before the system was shut down. Total time used for start-up is about 2 minutes.
NOTE:
The power for on-board peripheral auxiliary equipments are commonly switched with the
ON/OFF
button. So the auxiliary equipment need not to be switched ON/OFF separately.
OFF (STAND-BY) (R3 only) OFF (Stand-by)
ON
ON (R3 only)