GE
DRAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-83
8-14-3-1
Removal Procedure - Trackball Ring
NOTE:
Removal of Trackball Ring and Cleaning does not require tools.
1) Turn the ring counter clock-wise
2) Lift trackball from OP Panel
Figure 8-73 Trackball Ring
8-14-3-2
Removal Procedure - OP Panel Assy
Figure 8-74 OP Panel Assy
1) Remove 7 screws from bottom of the OPIO Base.
Figure 8-75 Bottom of OPIO Base