GE
DRAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-157
Section 8-34
Replacement of AC Cable Holder
8-34-1
Manpower
1 Person, 5 minutes.
8-34-2
Tools
Standard Phillips Screwdriver.
8-34-3
Removal Procedure
1) Remove 2 Screws from AC Cable Holder
NOTE:
This procedure applicable to all AC Power Cord replacement
Figure 8-185 AC Cable Holder
8-34-4
Installation Procedure
Parts to be installed in reverse order of removal.
8-34-5
Functional Check
Visual inspection Only.