GE
DRAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-123
Section 8-21
Replacement of Link Arm Cable Hook
8-21-1
Manpower
1 Person, 10 minutes.
8-21-2
Tools
Standard Phillips Screwdriver.
8-21-3
Removal Procedure
1) Remove 1 screw and remove the Link Arm Top Cover as following figure.
Figure 8-145 Removal of Link Arm Top Cover.
2) Remove 2 screws. Refer to following figure.
Figure 8-146 screw points of Link Arm Cable Hook
8-21-4
Installation Procedure
Parts to be installed in reverse order of removal.
8-21-5
Functional Check
Visual Check only.