GE
DRAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-101
Section 8-17
Replacement around Nest Box
NOTE:
This section covers replacement of components related to Nest Box.
: MPI,MCB,MDC,MIO,CWD,DCWD,EEPROM,DC4D,Battery,HDD and SOM
8-17-1
Manpower
1 person, 15 minutes for each part.
8-17-2
Tools
Standard Phillips Screwdriver.
8-17-3
Pre-Work
1) Front cover removed. (refer to
2) Rear cover removed. (refer to
)
8-17-4
Nest Box Access
1) Remove Rear Cover. (refer to
2) Remove 2 screws and Power Cord Fix Bracket
.
Figure 8-106 Power Cord Fix Bracket.
Power cord Fix Bracket