GE
RAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
3-6
Section 3-3 - Receiving and Unpacking the Equipment
Section 3-3 Receiving and Unpacking the Equipment
Figure 3-4 envelope at front panel of the crate
Table 3-5
Unpacking Procedure
Step
Task
1.
Remove the top cover, then remove the out sleeve
.
2.
Remove the option box on front of the system
.
Check whether delivery is complete
(according to packing list) and check visual damage!
The envelope with delivery address, packing list and
invoice is located on the front panel of the crate.
top cover
out sleeve
Option box on front of the system