GE
DRAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
Chapter 3 - Setup Instructions
3-7
3.
Remove the monitor pads from the monitor and remove the 4 pads of the box bottom assy.
4.
Carefully remove foam packing material and plastic bag from the ultrasound unit and monitor.
Caution: Two people are needed in the next step due to the weight of the equipment
.
5.
Unlock the casters and place the 4 caster's direction like the picture below and then using the incline plane
of the box bottom assy, slowly move the system from the box.
Note: Packing crate and material should be stored for future use.
Table 3-5
Unpacking Procedure
Step
Task
monitor pad