GE
RAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
8-148
Section 8-29 - Replacement of Peripheral Cable Assy
8-29-1-5
Installation Procedure
Parts to be installed in reverse order of removal. But, refer to below procedure for cable ties.
Figure 8-173 Tie cables with the ties through the holes
2 holes for fixing cable tie
2 holes for fixing cable tie
Align the head of cable tie as shown
Align the head of cable tie as shown
Cable tie
Cable tie