GE
RAFT
LOGIQ P9/P7
D
IRECTION
5604324
, R
EVISION
11
DRAFT (J
ANUARY
24, 2019)
S
ERVICE
M
ANUAL
8-82
Section 8-14 - Replacement of OPIO and Related Parts
Section 8-14
Replacement of OPIO and Related Parts
NOTE:
This section describes removal and installation of OPIO and related parts.
OPIO Assy itself, Main PWA Assy, LCD Touch module Assy, HUB Board, Encoder, Freeze key Assy,
OPIO AN Key & Gel warmer board and Trackball Assy.
8-14-1
Manpower
1 person, 5 minutes.
8-14-2
Tools
Standard Phillips Screwdriver.
8-14-3
Removal Procedure
Nesting of the parts are as follows.
For example, to access Encoder for repair, OP Panel must be removed and then OPIO Main PWA assy
must be removed.
Figure 8-72 OP Panel Assy
External USB Board
OPIO AN Key & GEL
Warmer board