5-162
C70 Capacitor Bank Protection and Control System
GE Multilin
5.6 GROUPED ELEMENTS
5 SETTINGS
5
T
he phase directional element responds to the forward load current. In the case of a following reverse fault, the ele-
ment needs some time – in the order of 8 ms – to establish a blocking signal. Some protection elements such as
instantaneous overcurrent may respond to reverse faults before the blocking signal is established. Therefore, a
coordination time of at least 10 ms must be added to all the instantaneous protection elements under the supervi-
sion of the phase directional element. If current reversal is of a concern, a longer delay – in the order of 20 ms –
may be needed.
Figure 5–62: PHASE DIRECTIONAL SCHEME LOGIC
NOTE
FLEXLOGIC OPERAND
FLEXLOGIC OPERAND
FLEXLOGIC OPERAND
FLEXLOGIC OPERAND
SETTING
SETTING
SETTING
SETTING
SETTING
SETTING
PHASE DIR 1
FUNCTION:
PHASE DIR 1 SOURCE:
PHASE DIR 1 BLOCK OC
WHEN V MEM EXP:
PHASE DIR 1
BLOCK:
PHASE DIR 1 ECA:
PHASE DIR 1 POL V
THRESHOLD:
PH DIR1 BLK A
PH DIR1 BLK B
PH DIR1 BLK C
PH DIR1 BLK
IA
No
Seq=ABC
Seq=ACB
Yes
VBC
VCB
827078A7.CDR
Off=0
V MINIMUM
-Use V when V Min
-Use V memory when
V < Min
I 0.05 pu
Enabled=1
AND
AND
OR
MEMORY TIMER
1 cycle
1 sec
Vpol
0
I
1
RUN
AND
PHASE B LOGIC SIMILAR TO PHASE A
PHASE C LOGIC SIMILAR TO PHASE A
OR
USE ACTUAL VOLTAGE
USE MEMORIZED VOLTAGE
Summary of Contents for C70
Page 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Page 394: ...5 270 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 676: ...E 10 C70 Capacitor Bank Protection and Control System GE Multilin E 1 OVERVIEW APPENDIX E E ...
Page 698: ...H 8 C70 Capacitor Bank Protection and Control System GE Multilin H 3 WARRANTY APPENDIX H H ...