2-8
C70 Capacitor Bank Protection and Control System
GE Multilin
2.2 ORDER CODES
2 PRODUCT DESCRIPTION
2
2.2ORDER CODES
2.2.1 OVERVIEW
The C70 is available as a 19-inch rack horizontal mount or reduced-size (¾) vertical unit and consists of the following mod-
ules: power supply, CPU, CT/VT, digital input and output, transducer input and output, and inter-relay communications.
Each of these modules can be supplied in a number of configurations specified at the time of ordering. The information
required to completely specify the relay is provided in the following tables (see chapter 3 for full details of relay modules).
Order codes are subject to change without notice. See the ordering page at
http://www.gegridsolutions.com/multilin/order.htm
for the latest options.
The order code structure is dependent on the mounting option (horizontal or vertical) and the type of CT/VT modules
(enhanced diagnostic CT/VT modules or HardFiber process bus modules). The order code options are described in the fol-
lowing sub-sections.
2.2.2 ORDER CODES WITH ENHANCED CT/VT MODULES
The order codes for the horizontal mount units are shown below.
Table 2–4: C70 ORDER CODES (HORIZONTAL UNITS)
C70
-
*
**
- *
*
* - F
**
- H
**
- M
**
- P
**
- U
**
- W/X
**
Full Size Horizontal Mount
BASE UNIT
C70
|
|
|
|
|
|
|
|
|
|
|
Base Unit
CPU
T
|
|
|
|
|
|
|
|
|
|
RS485 with 3 100Base-FX Ethernet, multimode, SFP with LC
U
|
|
|
|
|
|
|
|
|
|
RS485 with 1 100Base-T Ethernet, SFP RJ-45 + 2 100Base-FX Ethernet, multimode, SFP with LC
V
|
|
|
|
|
|
|
|
|
|
RS485 with 3 100Base-T Ethernet, SFP with RJ-45
SOFTWARE
00
|
|
|
|
|
|
|
|
|
No software options
03
|
|
|
|
|
|
|
|
|
IEC 61850
12
|
|
|
|
|
|
|
|
|
Enhanced capacitor bank control (time and date, capacitor control supervision, automatic voltage regulator)
13
|
|
|
|
|
|
|
|
|
Enhanced capacitor bank control and IEC 61850
A0
|
|
|
|
|
|
|
|
|
CyberSentry Lvl 1
A3
|
|
|
|
|
|
|
|
|
CyberSentry Lvl 1 and IEC 61850
AC
|
|
|
|
|
|
|
|
|
CyberSentry Lvl 1 and enhanced capacitor bank control
AD
|
|
|
|
|
|
|
|
|
CyberSentry Lvl 1, IEC 61850, and enhanced capacitor bank control
B0
|
|
|
|
|
|
|
|
|
IEEE 1588
B3
|
|
|
|
|
|
|
|
|
IEEE 1588 and IEC 61850
BC
|
|
|
|
|
|
|
|
|
IEEE 1588 and enhanced capacitor bank control
BD
|
|
|
|
|
|
|
|
|
IEEE 1588, IEC 61850, and enhanced capacitor bank control
C0
|
|
|
|
|
|
|
|
|
Parallel Redundancy Protocol (PRP)
C3
|
|
|
|
|
|
|
|
|
PRP and IEC 61850
CC
|
|
|
|
|
|
|
|
|
PRP and Enhanced Capacitor Bank Control
CD
|
|
|
|
|
|
|
|
|
PRP, IEC 61850, and Enhanced Capacitor Bank Control
D0
|
|
|
|
|
|
|
|
|
IEEE 1588 and CyberSentry Lvl 1
D3
|
|
|
|
|
|
|
|
|
IEEE 1588, CyberSentry Lvl 1, and IEC 61850
DC
|
|
|
|
|
|
|
|
|
IEEE 1588, CyberSentry Lvl 1, and enhanced capacitor bank control
DD
|
|
|
|
|
|
|
|
|
IEEE 1588, CyberSentry Lvl 1, IEC 61850, and enhanced capacitor bank control
E0
|
|
|
|
|
|
|
|
|
IEEE 1588 and PRP
E3
|
|
|
|
|
|
|
|
|
IEEE 1588, PRP, and IEC 61850
EC
|
|
|
|
|
|
|
|
|
IEEE 1588, PRP, enhanced capacitor bank control
ED
|
|
|
|
|
|
|
|
|
IEEE 1588, PRP, IEC 61850, and enhanced capacitor bank control
F0
|
|
|
|
|
|
|
|
|
PRP and CyberSentry Lvl 1
F3
|
|
|
|
|
|
|
|
|
PRP, CyberSentry Lvl 1, and IEC 61850
FC
|
|
|
|
|
|
|
|
|
PRP, CyberSentry Lvl 1, and enhanced capacitor bank control
FD
|
|
|
|
|
|
|
|
|
PRP, CyberSentry Lvl 1, IEC 61850, and enhanced capacitor bank control
G0
|
|
|
|
|
|
|
|
|
IEEE 1588, PRP, and CyberSentry Lvl 1
G3
|
|
|
|
|
|
|
|
|
IEEE 1588, PRP, CyberSentry Lvl 1, and IEC 61850
GC
|
|
|
|
|
|
|
|
|
IEEE 1588, PRP, CyberSentry Lvl 1, and enhanced capacitor bank control
GD
|
|
|
|
|
|
|
|
|
IEEE 1588, PRP, CyberSentry Lvl 1, IEC 61850, and enhanced capacitor bank control
J0
|
|
|
|
|
|
|
|
|
IEC 60870-5-103
J3
|
|
|
|
|
|
|
|
|
IEC 60870-5-103 and IEC 61850
JC
|
|
|
|
|
|
|
|
|
IEC 60870-5-103 and enhanced capacitor bank control
JD
|
|
|
|
|
|
|
|
|
IEC 60870-5-103, IEC 61850, and enhanced capacitor bank control
K0
|
|
|
|
|
|
|
|
|
IEEE 1588, PRP, and IEC 60870-5-103
K3
|
|
|
|
|
|
|
|
|
IEEE 1588, PRP, IEC 60870-5-103, and IEC 61850
KC
|
|
|
|
|
|
|
|
|
IEEE 1588, PRP, IEC 60870-5-103, and enhanced capacitor bank control
KD
|
|
|
|
|
|
|
|
|
IEEE 1588, PRP, IEC 60870-5-103, IEC 61850, and enhanced capacitor bank control
L0
|
|
|
|
|
|
|
|
|
IEC 60870-5-103, IEEE 1588, PRP, and CyberSentry Lvl 1
L3
|
|
|
|
|
|
|
|
|
IEC 60870-5-103, IEEE 1588, PRP, CyberSentry Lvl 1, and IEC 61850
LC
|
|
|
|
|
|
|
|
|
IEC 60870-5-103, IEEE 1588, PRP, CyberSentry Lvl 1, and enhanced capacitor bank control
LD
|
|
|
|
|
|
|
|
|
IEC 60870-5-103, IEEE 1588, PRP, CyberSentry Lvl 1, IEC 61850, and enhanced capacitor bank control
MOUNT/COATING
H
|
|
|
|
|
|
|
|
Horizontal (19” rack)
A
|
|
|
|
|
|
|
|
Horizontal (19” rack) with harsh-environment coating
FACEPLATE/ DISPLAY
C
|
|
|
|
|
|
|
English display
P
|
|
|
|
|
|
|
English display with 4 small and 12 large programmable pushbuttons
D
|
|
|
|
|
|
|
French display
R
|
|
|
|
|
|
|
Russian display
A
|
|
|
|
|
|
|
Chinese display
K
|
|
|
|
|
|
|
Enhanced front panel with English display
M
|
|
|
|
|
|
|
Enhanced front panel with French display
Q
|
|
|
|
|
|
|
Enhanced front panel with Russian display
U
|
|
|
|
|
|
|
Enhanced front panel with Chinese display
L
|
|
|
|
|
|
|
Enhanced front panel with English display and user-programmable pushbuttons
N
|
|
|
|
|
|
|
Enhanced front panel with French display and user-programmable pushbuttons
T
|
|
|
|
|
|
|
Enhanced front panel with Russian display and user-programmable pushbuttons
V
|
|
|
|
|
|
|
Enhanced front panel with Chinese display and user-programmable pushbuttons
W
|
|
|
|
|
|
|
Enhanced front panel with Turkish display
Y
|
|
|
|
|
|
|
Enhanced front panel with Turkish display and user-programmable pushbuttons
I
|
|
|
|
|
|
|
Enhanced front panel with German display
J
|
|
|
|
|
|
|
Enhanced front panel with German display and user-programmable pushbuttons
NOTE
Summary of Contents for C70
Page 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Page 394: ...5 270 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 676: ...E 10 C70 Capacitor Bank Protection and Control System GE Multilin E 1 OVERVIEW APPENDIX E E ...
Page 698: ...H 8 C70 Capacitor Bank Protection and Control System GE Multilin H 3 WARRANTY APPENDIX H H ...