GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 224
Section 8-9 - BEP (Back End Processor) parts replacement
8-9-5-2
BEP Side I/O Board installation
Table 8-136 BEP Side I/O Board installation
Steps
Corresponding Graphic
1.
Slowly and carefully slide in the
replacement I/O Board into the BEP,
making sure to avoid hitting components
and circuit pins on both sides of the board.
Pay attention on the guides pins (on the
BEP frame and the slots on the I/O Board),
the guide pins need to be inserted into the
slots. Guide the I/O Board into the BEP
frame.
I/O Board installation guides and slots
2.
Re-install the four screws and tighten securely.
3.
Re-install the Option Dongle.
4.
Reconnect the I/O cabling.
5.
Connect the battery cable to
PCN1
and the CB to PB cable to
PCN2
on the CB. Make sure the
cable connectors are “locked“ into place on the CB connections.
6.
Make sure all cables are clear of the BEP Cover and tilt the top of the BEP cover toward the BEP.
NOTICE
Be careful not to pinch any of the cables when installing the BEP cover.
7.
Tighten and secure the thumb screws or screws at the top of the BEP cover, or the three screws
that attach the cover to the BEP.
8.
Replace the side cover.
9.
Perform Functional Checks. See:
8-9-5-3 - Calibration and adjustments
,
8-9-5-4 - Verification
and
8-9-5-5 "Functional Checks" on page 8-225
.
Summary of Contents for 5205000
Page 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Page 2: ......
Page 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Page 807: ......
Page 808: ......