GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 8 Replacement procedures
8 - 121
8-6-4-2
V2 LCD Arm Assembly Adapter installation
Table 8-75 V2 Arm Adapter installation
Steps
Corresponding Graphic
1.
Insert the Adapter into the Frame UI Upper
Assembly.
Align the mounting holes and install the two
M5 x 50 hex key screws using a 4 mm Hex
Key to secure the Adapter. Torque 2.5 Nm
(1.8 lbf-ft {21.6 lbf-in}).
NOTE: Note the shape of the rear
mounting hole, this is important for the
next step before the Thrust Plate is
installed.
2.
NOTE: MAKE SURE the rear mounting
hole for the Arm Neck Lock Pin, in the Trust
Plate is aligned with the rear mounting hole
of the Adapter BEFORE installing the
Plate. If the Plate is installed incorrectly, it
may be very difficult to remove.
Align the rear mounting hole for the Arm
Neck Lock Pin, in the Trust Plate with the
rear mounting hole of the Adapter.
Seat the Plate. The plate will be captured
by the two retaining pins that protrude from
the Adapter.
3.
Install the Ground Cable to the LCD
Adapter and to the Bulkhead using the two
screws and lock washers. Torque 1.3 Nm
(0.96 lbf-ft {11.5 lbf-in}).
LCD Ground Cable installed
4.
Re-install the LCD and Arm Assembly and connect the LCD Cable.
Summary of Contents for 5205000
Page 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Page 2: ......
Page 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Page 807: ......
Page 808: ......