GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 296
Section 8-11 - Peripherals replacement
2.
Position the Pack at the top of the BEP.
Be sure the lip, on the underside of the
Pack, hooks on the edge of the Card Rack,
and the three tabs insert into the slots on
the top of the BEP frame. The lip “clamps”
the Card Rack and BEP (
2
) together. This
is a tight fit.
Lower the lower Column Cover.
Slide the Shear Wave Console Cover
Assembly (
4
) into the console.
Position the Main Console Front Cover to
engage the lower Column Cover stop tabs
(
3
).
Latch the two latches (
1
) that clamp the
Pack to the top of the BEP.
3.
Reinstall the Antennas on the top of the
BEP, if the Attunes were removed.
4.
Replace the covers.
5.
Perform Functional Checks. See:
8-11-9-3 - Calibration and adjustments
,
8-11-9-4 - Verification
and
8-11-9-5 "Functional Checks" on page 8-297
.
Table 8-185 Capacitor Pack Installation
Steps
Corresponding Graphic
Summary of Contents for 5205000
Page 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Page 2: ......
Page 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Page 807: ......
Page 808: ......