GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 116
Section 8-6 - Replacing Top Console Parts
6.
After plugging in the LCD Cable, bend the
cable as shown, pull with your index finger
and push with your thumb. The “S” bend
allows the cable to flex in the up direction
when the Bulk Head Cover is installed.
Install the Bulkhead Cover.
7.
Install the Bulkhead Cover.
8.
Perform Functional Checks. See:
8-6-3-4 - Calibration and adjustments
,
8-6-3-5 - Verification
and
8-6-3-6 "Functional Checks" on page 8-117
.
Table 8-70 LCD Monitor V2 Arm assembly installation - R5 and later
Steps
Corresponding Graphic
Summary of Contents for 5205000
Page 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Page 2: ......
Page 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Page 807: ......
Page 808: ......