GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 242
Section 8-9 - BEP (Back End Processor) parts replacement
8-9-9-2
BEP Battery Pack installation
NOTE:
ALL batteries MUST BE recycled or disposed of in accordance with local, state, or country laws.
Table 8-154 BEP Battery Pack installation
Steps
Corresponding Graphic
1.
Route the battery cable through the cable opening into the BEP and position the BEP Battery
Pack into place.
2.
Install the battery stabilizer strips beside the Battery Pack.
3.
Install the Battery Pack Cover and the four screws that secure the Battery Pack Cover to the BEP
cover. Tighten screws securely.
4.
Loosen the thumb screws or screws at the top of the BEP cover that attach the cover to the BEP.
Tilt the top of the BEP cover away from the BEP.
5.
Connect the battery cable to
PCN1
on the CB.
6.
Make sure all cables are clear of the BEP Cover and tilt the top of the BEP cover toward the BEP.
NOTICE
Be careful not to pinch any of the cables when installing the BEP cover.
7.
Tighten and secure the thumb screws at the top of the BEP cover, or the three screws that attach
the cover to the BEP.
8.
Replace the side cover.
9.
Perform Functional Checks. See:
8-9-9-3 - Calibration and adjustments
,
8-9-9-4 - Verification
and
8-9-9-5 "Functional Checks" on page 8-243
Summary of Contents for 5205000
Page 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Page 2: ......
Page 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Page 807: ......
Page 808: ......